None of them need an instrument to answer. Most of them get asked too late, or by us, after the money is already spent.
Metrology is three things you are already doing: collecting data, processing it, and reporting it. These questions run in that order, with a set on requirements ahead of all three, because the requirement is where the expensive mistakes start.
Read them straight through. The ones you cannot answer are the useful ones. If you can answer all twenty, you are in better shape than most plants we walk into, and you do not need to call us.
Is the problem you have the problem you think you have?
Somebody set that tolerance. Can they tell you why? A number copied off the last drawing is not a requirement.
If nobody can name the decision, you are paying to generate a number nobody uses.
A plate that comes out twisted is a shrinkage, restraint, and sequence problem. Measuring it more precisely will not straighten it.
No instrument closes a capability gap. It only tells you how far short you are, more often.
Capital is the easy part. A tracker with nobody qualified to plan a shot is an expensive tripod.
The only part most shops think about, and still the part most often planned last.
Where you set up, how many stations, in what order, and what you do when line of sight is blocked at station three.
A convenient alignment gives you a clean report and the wrong answer.
Free state, fixtured, on its side, still on the machine. Restraint changes the result, and the drawing may not say which condition it means.
Your sampling strategy decides whether you find the deviation or average it away.
If not, you are measuring your operators, not your parts.
Catalog accuracy is a laboratory claim. Your uncertainty includes the setup, the fixture, the environment, and the person holding the probe.
Where two people can take one honest scan and reach opposite verdicts.
For most shops the honest answer is that it sits on a laptop until the laptop gets replaced.
Two analysts, one scan, two verdicts. That is not measurement, that is opinion.
That means the raw data and the recipe that was run on it, not the PDF that came out the end.
A measurement that cannot fail a check has not passed one.
The drift you throw away is the warning you will wish you had kept.
The end everyone treats as paperwork, read later by people who were not there.
A report that needs its author in the room is not a deliverable, it is a meeting.
A colored deviation map is not an answer to whether it will fit.
A result that arrives after the part shipped is a record, not a control.
They may be using it to judge your capability, plan their fit-up, or decide the next award. You are being measured by your measurements.
No charge to find out whether we are the right people to help. Plenty of first calls end with us pointing you at something you can fix yourself.